Back to the build preview โ†—

Draft reference ยท October 2026

The build, illustrated

Earlier design (October 2026). This page describes the main and budget builds as they were drawn in October 2026. The current design is V1 (see the build preview): its frame, drum, rope exit, rack mount and fuses are different. This page is kept as a record until it is rewritten for V1. Do not build from it.

Stills from the build animation of the main build: the bolted aluminum frame, the drum and level-wind, the motor, the electronics, the covers and the rack mount. They are renders of an earlier revision, with the previous motor, a larger drum and the earlier rack side: the current main build is longer, on the MP8085 motor and a 7/8 in drum. They show the layout and the build order; they are not a confirmed fabrication or assembly procedure. The written build order has the steps. Both are drafts until the prototype has been built and load-tested.

1. The bolted frame

The bolted aluminum frame with its printed end pieces on the rack

The base, rear and motor face plates are 6061 aluminum and bolt together into one frame that carries every load, with three corner gussets at the rear joint. Every load-bearing screw goes to a nut in a window cut through the plate. The printed motor-end and battery-end pieces bolt to it, with the main fuse block.

2. The drum and the level-wind

The drum with its blue rope on two bearing holders, the lead screw and the level-wind in front of it

The level-wind rail and traveller go on the base plate first. The drum is built on the bench (hub, rope laced and clamped, shaft, gear, coupling) and lowered in on its two milled bearing holders. The drum's gear drives the lead screw, which moves the traveller so the rope lays evenly.

3. The motor

The motor mounted on the face plate at the end of the drum

The motor bolts to the face plate and drives the drum directly through one clamp coupling: no belt and no gearbox.

4. Electronics, battery and wiring

The open trainer with the motor, the controller, the boards and the batteries in place

The ODrive sits on its bracket, the control boards on the front plate, and the two battery packs slide into their cradle. The harness goes in last, fuses first. See the wiring reference.

5. Covers, screen and exit

The finished unit with its dark printed covers, touchscreen and the cable exit with the rope

The screen, Raspberry Pi, BMS and fan hang from the covers, which lower over the frame. The swivelling exit and the rope go on last. The screen content in the animation is an interface concept.

6. On the rack

Close-up of the rack side on the upright, the pull ring and the latch on the back of the unit

The rack side goes on a 3 in rack upright with one hitch pin and a lever clamp (the render shows an earlier version). The unit hangs on it and a spring latch locks it in place; pull the ring to lift it off.

What comes next

V1's CAD, build files and software are released together after the prototype is tested. Follow the roadmap, or join the build list and kit waitlist at joulvo.com.

Animation imagery from the Joulvo Gym project (formerly Kinetiq Gym), shared with the documentation under CC BY-SA 4.0. Third-party components are shown for their role in the design; this does not imply endorsement.

A draft reference: the prototype is being built and tested, and V1's CAD, build files and software are released after testing.

Download Markdown source โ†—