Safety

Status: a design in CAD. Nothing has been built in metal or load-tested yet, and nothing here is a load rating. Treat every number as a design estimate until your own build has passed the tests below.

The numbers below are the earlier design's (October 2026). The current design is V1 (see the build preview). The hazards are the same on V1 and on the builds that follow it; the parts named below (the drum size, the toggle clamp, the single hitch pin, the fuse) are not. V1's own figures are design estimates, and the builds named for 220 lb and 300 lb have not been calculated at those loads. This page will be rewritten for V1.

What can hurt you

Rules for every build

  1. Payout window in software. Home the drum fully wound at every power-up and set the payout limit (setup reference). The traveller's hard stops at each end of its rail are only a backstop for assembly and hand-turning: the lead screw is geared to the drum, so a stop hit under power locks the drum through the printed gears and can strip them.
  2. Keep the dead wraps of rope on the drum at full payout (3 on the main build). Never run the rope off the drum.
  3. Fuses rated 58 V DC (main build): the 40 A MRBF main fuse, the 3 A regulator fuse and the 10 A charge fuse, in holders rated 58 V. Common 32 V automotive fuses and holders are not rated for this pack voltage.
  4. Bolted joints and adhesives. Every load-bearing screw goes to a nut; nothing in the load path is screwed into a tapped hole or an insert. Loctite 243 on the gusset, drum and rack-cheek screws. The drum flanges are bonded to the tube, and the hub to the shaft, with Loctite 638: no load for 24 h. Check the frame and rack-side screws after the load test.
  5. First power-up with the rope unloaded and nobody in its path: check the inrush at the power button (the BMS may trip; lengthen its short-circuit delay in the BMS app if it does), the drum's direction, the motor thermistor reading, the payout window, the over-voltage trip and the regen limit.
  6. Bench-test the drive before training at the rated force: the motor's torque against current, the controller's current through a 30 s set, and the motor's heat over several sets.
  7. Load test before training: hang a static load in steps up to 1.5 x your planned use, with nobody in the rope's path. Then test powered, starting light.
  8. Printed parts: print them in the specified materials, with the walls and infill in the printing reference, and print the fit coupons first. The screw-end tower must be printed on its side.

No warranty

The design is shared under the licenses in LICENSE.md without any warranty. You build and use it at your own risk.

A draft reference: the prototype is being built and tested, and V1's CAD, build files and software are released after testing.